Hunter
Douglas is Hot Choice for Fire Control Centres
The completion of cladding installation at Wakefield's
new Fire Control Centre has coincided with an award for the recently
completed Fire Control Centre in County Durham.
Both projects involved the installation of Hunter Douglas's advanced
ventilated (rainscreen) façade system, QuadroClad.

The
two Fire Control Centres, in Belmont Business Park, County Durham, and
Paragon Business Village, Wakefield, form part of Government plans to
create a modern network of nine new fire control centres across the
country to replace the existing 46 control rooms.
The £12.8m Durham centre, which replaces existing control rooms
in Cleveland, Durham, Northumberland and Tyne & Wear, was officially
opened by Fire Minister Parmjit Dhanda earlier this year.

The
building, designed by Newcastle-based Dewjo'c Architects, has already
been awarded the 2007 Office Development Award in the annual Landmark
Awards organised by leading northern business publication The Journal.
The Wakefield project, which will become the new Control Centre covering
the Yorkshire and Humber region, includes integrated Hunter Douglas
Aerofoils, which were also supplied by Hunter Douglas alongside the
QuadroClad ventilated façade panels.
Andrew Lee, general manager of Hunter Douglas Facades & Sun Control,
said: There were some challenging requirements within the façade
brief, such as ultra-flat panels and the development of additional support
structures to cater for an unusually large void behind some of the cladding.

Hunter Douglas is accustomed to handling this type of bespoke
requirement, which is why our products were specified.
The announcement of the Landmark Award for the Durham Fire Control
Centre was fantastic news. It's the icing on the cake for what has been
a very successful project.
The cavity wall construction on this project achieves a very high thermal
efficiency and an air leakage rate four times that required by the current
Building Regulations, and achieved an 'excellent' BREEAM rating.
Whelan Construction Development was the main contractor on the Durham
Fire Control Centre, with Dane Architectural the cladding contractor.
The Manchester office of architect Broadway Malyan is responsible for
the Wakefield control centre, partnered by main contractor Costain and
cladding contractor Rossway Dowd.
Web: http://www.hunterdouglas.co.uk